You are not logged in.

Te Kauwhata Walkway

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 34918271
Tender Name : Te Kauwhata Walkway
Reference # : 26-27-011
Open Date : Friday, 11 September 2026 12:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 9 October 2026 2:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 22000000 - Building and Construction Machinery and Accessories
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 71120000 - Well drilling and construction services
  • 72110000 - Residential building construction services
  • 72120000 - Nonresidential building construction services
  • 72140000 - Heavy construction services
  • 72150000 - Specialized trade construction and maintenance services
Regions:
  • Waikato
Exemption Reason : None
Required Pre-qualifications : None
Contact : Niten Singh
tenders@waidc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Stage 1 of the Te Kauwhata Domain footpath project was completed in 2023 and included the construction of new concrete and gravel walking paths within the Domain. Following completion of the works, sections of the adjacent slope experienced subsidence, resulting in unsupported areas of concrete footpath and scour damage to parts of the gravel path. Reviews undertaken by Council staff, the original designers, and the contractor confirmed the works were generally completed in accordance with the approved design.

Council is now seeking a supplier to undertake remedial works to address the affected areas while also progressing the next stage of the Domain walkway network by constructing as much additional footpath as possible within the available budget. Detailed designs are attached in Appendix 1.

The high-level outcomes of this project are:

• Construction of new concrete and aggregate footpath
• Construction of new concrete pads for exercise equipment and benches
• Completion of remedial works
• Minor earthworks adjacent to new footpath
• Minor drainage installation


Crown Copyright © 2026