Main contractor for Hall gutter and roof work, and floor remediation at Mihi School

Details

RFx ID : 35216632
Tender Name : Main contractor for Hall gutter and roof work, and floor remediation at Mihi School
Reference # : 250070
Open Date : Thursday, 15 October 2026 3:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 12 November 2026 4:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Bay of Plenty
Exemption Reason : None
Required Pre-qualifications : None
Contact : All communication must take place through GETS Q&A function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

a. Based on Condition-Assessment-Mihi-School-Andrew-Golding-11-Apr-2025, the project is focused on investigating and addressing water ingress issues affecting the Mihi School Hall building. The assessment identified several high-risk areas, including roof-to-wall junctions, flashing details, gutters, glazing interfaces, and door openings that may be allowing water penetration into the building.

This may include:
i. The assessment recommends remedial works to improve the weathertightness performance of the building and reduce the risk of future water intrusion.
ii. Has experienced ongoing water ingress issues within the Hall building. A condition assessment identified potential defects associated with roof and wall junctions, flashing arrangements, gutter design, glazing interfaces, and external door details. Evidence of moisture damage was observed internally, including deterioration to flooring finishes.

a. The Contract Works required are:
i. Investigate and rectify water ingress pathways affecting the Hall building.
ii. Repair or redesign deficient roof, flashing, and gutter interfaces.
iii. Improve weatherproofing around glazing systems and external doors.
iv. Removal of existing areas of damaged flooring around entrances, install fixed heavy duty inlaid entrance matting, size to be confirmed on site.