| RFx ID : | 35184882 |
| Tender Name : | RFT Rototuna High School B Gym Wall Lining |
| Reference # : | 254840 |
| Open Date : | Thursday, 15 October 2026 10:00 AM (Pacific/Auckland UTC+13:00) |
| Close Date : | Thursday, 12 November 2026 3:00 PM (Pacific/Auckland UTC+13:00) |
| Department/Business Unit : | Ministry of Education - Approval from Ministry Employee - ie. Case Manager |
| Tender Type : | Request for Tenders (RFT) |
| Tender Coverage : | On behalf of procurement agent [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
All enquiries to be made through GETs |
| Alternate Physical Delivery Address : | |
| Alternate Physical Fax Number : |
The current wall system is structurally inadequate and poses safety risks due to the poor original installation. The proposed works will ensure long-term durability, compliance with safety and fire standards, and improved safety for gym users
requirements for phasing and / or staged handover of the project will be required as the gym is a live environment with usage booked in advance, coordination with The Peak management will be required
Fosters Maintain and Thorburn Builders have been previously engaged to carry out repairs and invasive investigation works to confirm extent of works required.
General Scope;
Remove existing lower section of plywood panels, and dispose Carry out necessary remedial works to the substructure and rondo system to allow for installation of new plywood panels, which may include removal of inadequate framing, battens and fixings in affected areas and Install new support framing to provide a rigid fixing substrate for the wall lining and existing curtain winch brackets and other existing wall fixings
Install new wall linings. Make good and recoat affected areas to match existing finishes.
Where necessary remove curtain system and reinstate on completion. Reinstate and test curtain operation to original/current working order and ensure all fixings and brackets altered during replacement works are secure upon completion
Remove all waste materials and leave the area clean and operational on completion of each staged works.
Floor protection will be required for the work area as new coating is to be applied. Works will not be able to be carried out during this period of December 21st through to January 5th.