You are not logged in.

Dargaville High School – Shade Structure Installation

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 35135703
Tender Name : Dargaville High School – Shade Structure Installation
Reference # : 262764
Open Date : Tuesday, 13 October 2026 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 10 November 2026 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through GETs
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The work required is the turn-key design and build of a standalone, open-ended tensile membrane canopy over the existing asphalt multi-sport courts at Dargaville High School.

The Contract Works include:

- Structural engineering, 3D modelling, and working and shop drawings
- Building consent, including all documentation and producer statements (PS1, PS3 and PS4) needed for the Code Compliance Certificate
- A NZ-fabricated, hot-dip galvanised steel frame with a minimum 50-year design life, compliant with the NZ Building Code, AS/NZS 5131 and AC1828
- A PVC tensile membrane (SKY W9400 or equivalent) with a maximum of 13% light transmission, low glare and a minimum 25-year pro rata warranty
- Bored pier foundations, independent of existing buildings. The indicative concept uses about 14 piers, each 900mm in diameter and 3.0 to 3.5m deep
- Concrete and asphalt cutting, spoil disposal, and reinstating the court surface around each post
- Rainwater collection connected to the existing stormwater system
- Any geotechnical investigation needed, and locating underground services
- As-built drawings, operation and maintenance manuals, and warranties at handover

The works are on an operating school site. They will be delivered in a single stage with one handover at Practical Completion.


Crown Copyright © 2026