You are not logged in.

TKKM Rāwhiti Roa – Site: Drainage Works – Main Construction Contractor

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 35047163
Tender Name : TKKM Rāwhiti Roa – Site: Drainage Works – Main Construction Contractor
Reference # : 240864
Open Date : Monday, 19 October 2026 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Monday, 16 November 2026 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : All communications must take place through the GETS Question & Answer function.
Alternate Physical Delivery Address  : All submissions are to be made through the GETS website.
Alternate Physical Fax Number  :
Overview

The outcome sought from this procurement is the securing of the services of a suitably qualified and experienced main contractor to undertake the proposed Site: drainage works. The Kura’s original 5YA project scope included a drainage works design project. The system has had urgent remediation works undertaken already and the design of the new drainage system is complete. Due to the location of the proposed works and potential for disruption of the Kura’s operations, the contract works must be delivered during school holidays.

The proposed scope includes the replacement of existing concrete paving to direct surface water towards new overland flow paths between Blocks 2, 3 & 5. The existing covered way path currently acts like a dam preventing surface water to flow through the natural flow path, so grated channels are proposed to allow water to escape when the surface flow exceeds the capacity of the existing catchpit. Additional ground contouring is proposed to deflect surface water from the area and instead direct to an existing adjacent catchpit and drainage network. Additionally, there are several areas of replacement drainage works required following a recent CCTV of the existing drains at the Kura. There is also some remedial wastewater drainage required, including the installation of new access chambers to resolve a sharp bend in the existing WW drainage infrastructure that has a tendency to block regularly.