| RFx ID : | 34668765 |
| Tender Name : | Roofing Contractor Re-roofing of blocks A,C & F at Kapiti College |
| Reference # : | |
| Open Date : | Wednesday, 12 August 2026 9:00 AM (Pacific/Auckland UTC+12:00) |
| Close Date : | Thursday, 10 September 2026 5:00 PM (Pacific/Auckland UTC+12:00) |
| Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
| Tender Type : | Request for Tenders (RFT) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
All enquires are to be made through the GETS question and answer function |
| Alternate Physical Delivery Address : | |
| Alternate Physical Fax Number : |
1.2 The Kapiti College BOT seek the services of a Roofing Contractor to undertake the re-roofing of Blocks A, C & F (all shown on Drawings supplied by Ruruku).
The works involve the following scope
• Install scaffold and edge protection as outlined in a SSSP
• Remove old roof cladding, flashings, fixings and accessories in a planned stage manner to tie in with the laying of the new material
• Install new cladding, fixings, flashings and accessories as indicted in the attached drawings.
• Use trampolines and covers to ensure weathertightness throughput the reroofing process
Requirements for phasing and/or staged handover of the project: this project does not require staging but work on one block at a time is preferable. The contractors will provide a construction programme with their tender submissions.
Project consultants are:
• Project Manager: Ian Rattray – Ruruku
Lead Designer: Krish Rudra - Ruruku
1.3 The Contractor will be engaged through a Medium Works Contract (Construction contracts for professional services and works).
• Timeframes are:
• Start date: October 2026
• Due Date for Completion: January 2027
• The program is negotiable with a preferred supplier if their price is right.
• The project will be a complete turnkey project where the completed section of the building ready for school use will be handed over on completion.