You are not logged in.

ROI - Main Roofing Contractor for Mangere Central School - 3, 7, 9, A, C: Roof, Clearlite & Gutter Replacements and Install Safety Mesh to Clearlite

Details

RFx ID : 33751032
Tender Name : ROI - Main Roofing Contractor for Mangere Central School - 3, 7, 9, A, C: Roof, Clearlite & Gutter Replacements and Install Safety Mesh to Clearlite
Reference # :
Open Date : Wednesday, 1 April 2026 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 22 April 2026 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Registration of Interest (ROI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Auckland
Required Pre-qualifications : None
Contact : All submissions to be made through the GETS website.
Alternate Physical Delivery Address  : All submissions to be made through the GETS website.
Alternate Physical Fax Number  : All submissions to be made through the GETS website.
Overview

The specialist roof report has noted the following capital works that require addressing:
• Block 3
- Roof B – The coated membrane roof is in poor condition, at end of life and requires replacement.
- Roofs B & D – The older box gutters are in poor condition, at end of life and require replacement.
- Roofs C & D – The older PVC gutters are in poor condition, at end of life and require replacement.
- Roof D – The painted corrugated roof is in poor condition, at end of life and requires replacement.
• Block 7
- Roof A – The older PVC gutters are in poor condition, at end of life and require replacement.
• Block 9
- Roof A – The older PVC gutters are in poor condition, at end of life and require replacement.
• Block A
- Roof B - There is no safety mesh under the clearlite. The clearlite is in good condition and it has been recommended to uplift the clearlite, install safety
mesh and reinstate the clearlite. This will need to be provided in-line with MoE guidelines.
• Block C
- Roof B - There is no safety mesh under the clearlite. The clearlite is in good condition and it has been recommended to uplift the clearlite, install safety
mesh and reinstate the clearlite. This will need to be provided in-line with MoE guidelines.