RFT - Main Contractor for Replacement Playground Retaining Wall & Siteworks at Matarau School

Details

RFx ID : 32985842
Tender Name : RFT - Main Contractor for Replacement Playground Retaining Wall & Siteworks at Matarau School
Reference # : 255185
Open Date : Wednesday, 12 November 2025 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 5 December 2025 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : All communications must take place through the GETS Question & Answer function.
Alternate Physical Delivery Address  : All submissions are to be made through the GETS website.
Alternate Physical Fax Number  :
Overview

The outcome sought by this request for tender is the securing of a qualified and experienced main contractor to undertake the proposed contract works.

The existing senior playground area is currently a health and safety concern for the school and has had to be temporarily closed / fenced off from students due to the area being unsafe and causing injuries.

The existing upper playground area remain generally as is due to the good condition of the retaining walls around this area, with only a new safety from falling barrier installed along 2x edges of the existing retaining wall. The lower retaining walls and playground area are to be removed and a single replacement low retaining wall installed to create a lower playground area clear of the existing large Norfolk Pine. Along with the replacement retaining wall, new subsoil drainage will be installed to address surface water issues potentially affecting the existing retaining walls and playground area. The supply and installation of new safety fall surfacing including fall safety rated bark laid over a new geotextile fabric and built-up ground.