Main Contractor for Blocks A,B: Building Envelope Remediation and Blocks A, B, H,T, T1, Covered Ways: Reroofing at Gisborne Intermediate

Details

RFx ID : 31608168
Tender Name : Main Contractor for Blocks A,B: Building Envelope Remediation and Blocks A, B, H,T, T1, Covered Ways: Reroofing at Gisborne Intermediate
Reference # : 249339
Open Date : Monday, 12 May 2025 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 9 June 2025 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Gisborne
Exemption Reason : None
Required Pre-qualifications : None
Contact : Adam Gatley
06 8679622
Alternate Physical Delivery Address  : All submissions are to be made through the GETS website.
Alternate Physical Fax Number  :
Overview

2.1 Background
Outcome sought is to:-
repair/replace cladding to Block A -Library, Block B - Hall . An allowance has been provided to replace wall framing as required. Hall has windows that are leaking and require new double-glazed windows within existing openings, make good scope has been provided.
Repair / replace roof cladding to Block A – Library, Block B – Hall, Block D – Roof fixings, Block H – toilet area, Covered Ways
The building work has been identified in specialist reports carried out in the school’s 10YPP and funding will be allocated from the school’s 5YA.
Some elements of the project work may need to be carried out outside of normal school hours.
Project consultants are:
Project Manager and Lead Designer: Architects 44 Ltd (James Blackburne)
2.2 Required solution (method and approach)
The Contract Works required are:
i. nature of the Works is replacing elements with new and repairing and replacement to bring building up to improved standards.
ii. The scale of the works is Medium
iii. Some elements of the project would need to be carried out outside of normal school hours.
iv. Site access is level and flat and offers easy vehicle access.
v. The Contractor will be engaged through a Medium Works Contract. No Contract related tags will be considered.. The Principal prefers there to be no drawings and specification related Tags.
i. See Tender Documents for further information.