You are not logged in.

RFT - Main Building Contractor for Block T1 - Cladding Remediation, Block A LSM Sensory Room at Adventure School

Details

Tender Closed
RFx ID : 28844456
Tender Name : RFT - Main Building Contractor for Block T1 - Cladding Remediation, Block A LSM Sensory Room at Adventure School
Reference # : 6054
Open Date : Wednesday, 21 February 2024 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 20 March 2024 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Manawatu-Wanganui
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS Question & Answer function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website.
Alternate Physical Fax Number  : All submissions to be made through the GETS website
Overview

This work combines two projects, to remediate weather tightness failures in Block T1 and develop a sensory room in Block A. Tender offers are to be submitted with separate costs for each of the two aspects.

Block T1 had some clear leak issues relating to its aged cladding and timber windows. Initially an assessment of the buildings north elevation found sufficient degraded cladding and timber glazing along with elevated levels of mould spores to warrant closing it. Subsequent tests found similar failures on the south elevation.

The agreed scope of remedial work will replace external cladding to the north and south elevations with weatherboard on a cavity system over RAB. Additionally, windows to the same extent will be replaced with double glazed aluminium including one door. Damaged framing identified will be replaced or remediated using a frame saver paint. The timber barge and fascia boards will be replaced along with all associated timber trims. Internal wall linings will be replaced to the same extent as the exterior with new gib and insulation fitted. Replace the autex pinboard and reinstate any affected services.

A property provisions report has identified the need to develop a sensory room to which a student/students can withdraw when they find themselves over stimulated by normal school activities. An under utilised space in Block A has been identified as suitable being able to allow both internal and external access whilst enable acoustic separation to adjacent spaces.

The interior linings will be striped out and new fitted over insulation to walls and ceiling. An existing window opening will be adjusted to allow for a new exterior door, timber windows will be replaced with double glazed aluminium. Walls providing separation with adjacent spaces will be upgraded to ensure a higher level of acoustic privacy. Acoustic linings will be fitted to provide targeted NRC’s. A beam will be fitted to support an indoor swing. Install a heat pump and replace lighting.

New storage systems will be installed and to address the new exterior access erect new steps and a landing.

It is expected that the school can facilitate handing over all the work areas to the contractor to be actioned as a single phase.