Tender Closed
|
|
RFx ID : | 28154213 |
Tender Name : | Out door learning space, Building Repairs, & heat pump replacements |
Reference # : | 233725 |
Open Date : | Monday, 25 September 2023 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Thursday, 19 October 2023 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All enquiries to be made through the GETS Question & Answer function |
Alternate Physical Delivery Address : | All submissions to be made through the GETS website |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
Blaketown school is in the coastal spray zone in Greymouth. There are several issues around the school that need to be addressed as part of this tender package. Structural connections are all galvanised and corroded. Blockwork needs repointing. Heat pump outdoor units are corroded. Electrical Distribution boards have no RCD protection. Flooring in areas of A block showing signs of wear. A proper completion of the veranda on Block A to create an outdoor learning space.
• Structural connections are all galvanized and are corroded these are to be replaced with stainless steel brackets including the siren sounder bracket.
• Block work. Repoint all block on the west end where the current pointing has failed.
• In A & I Blocks the heat pump outdoor units are corroded and need replaced with suitably sized units designed for coastal corrosion zone.
• Electrical Distribution Boards in Block A - 2 boards have no RCD protection and 1 board has no RCD protection and contains older style fuses. RCD protection to all circuits on the library DB and DB1. Replace main switchboard with new compliant board.
• Site covered entrance way. Structural connects are all galvanized and corroded these are to be replaced with stainless steel brackets.
• Block A Flooring. Staffroom, reception area. Principals office & corridor. Carpet is showing signs of wear. Take up dispose of. Replace with commercial carpet tiles.
• AMS: Block A Outdoor learning space. Proper completion of the veranda that currently exists outside of rooms 2 to 4 by extending it to room 1. This would allow the entire school to be taught in a more collaborative enquiring outdoor learning environment.
No Winner No submissions received