You are not logged in.

Malfroy School - G Block Refurbishment

Details

Tender Closed
RFx ID : 28042789
Tender Name : Malfroy School - G Block Refurbishment
Reference # : 232347
Open Date : Monday, 11 September 2023 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 6 October 2023 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Ministry of Education - Approval from Ministry Employee - ie. Case Manager
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 56000000 - Furniture and Furnishings
Regions:
  • Bay of Plenty
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS Question & Answer function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

Malfroy School has been undergoing Capital Works redevelopments over the last 2 years with removal of old classrooms from site, new modulars being brought onto site, removal of old library and new library. G Block is the final part of the redevelopment. WSP have held initial planning meetings and conducted site visits with the School and MoE to ascertain the requirements for Block G refurbishment. The existing G Block is outdated. The floor coverings are nearing end of life, the ceiling requires replacement, the wet benches require upgrade, some of the exterior parts are damaged, and some other areas require cladding replacements. Therefore, a refurbishment is required to support desired learning environment for the teachers and the learners.

Refurbishment of G Block (two classrooms, resource area and student toilets). Refurbishment involves mainly for replacements (no design element will be required). Replacements include carpet, vinyl, autex, wet bench areas, external joinery doors, gutters, down pipes, parts of exterior cladding, underfloor insulation, and all toilet linings.

Suspended ceiling, fixed whiteboard cabinetry units, toilet refurbishment, 100mm gutters with rainwater head overflows, underfloor insulation and replacement or re-screw of deck are low priority at the moment, however, if the budget allows after the main works then these items can be reviewed for refurbishment.