Tender Closed
|
|
RFx ID : | 25342700 |
Tender Name : | RFT - Main Building Contractor, Blocks 1, 2, 3 - Refurbish Classrooms, Replace Roofing, LSM Access, LSC Office, Newlands Primary School, Wellington |
Reference # : | 5122 |
Open Date : | Monday, 31 January 2022 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Thursday, 24 March 2022 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All enquires to be made through the GETS Question & Answer function |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
Newlands Primary School is looking to further develop and improve the condition and internal connection of the teaching spaces in Block 2.
The project sets out to rationalise student toilets and convert the space into a shared breakout/withdrawal room that can be used by two classrooms. Work is also required to create internal openings and provide improved internal transparency and student flow between three teaching spaces.
The contract requires new acoustic ceilings, new floor finishes to the altered spaces, and the introduction of a new set of exterior doors (room 5) along with internal glazed openings.
Metal roofing to both Blocks 2 and 3 has reached the end of its functional life. The replacement of this with new 0.55 Colorsteel Maxx or similar is to be included for in this project. Work to be undertaken on a like for like basis.
The school have received funding for two learning support coordinators (LSC) for which alterations are proposed to develop office and meeting areas. The work will include for new linings and finishes, new glazed openings, acoustic ceilings and LED lighting, storage joinery along with a tea making unit.
A learning support property provisions report has identified access issues about the school. Work is included for new ramped access to Block 1 and the hall, handrails to existing paths and the fitting of covers to existing open channel drains.
NOTE: -Pricing is to be provided for the three separate works. Asbestos Report will be loaded once received via NTT.
The scheme will be traditionally executed with a full design team employed by the Newlands Primary School Board of Trustees producing full construction documentation.
This tender has been awarded.