Main Contractor for Ngunguru School - Block 1, Block 2, Classrooms 10 & 11 + LSC Space Refurbishment

Details

Tender Closed
RFx ID : 24584768
Tender Name : Main Contractor for Ngunguru School - Block 1, Block 2, Classrooms 10 & 11 + LSC Space Refurbishment
Reference # :
Open Date : Monday, 26 July 2021 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 17 September 2021 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : All communications must take place through the GETS question and answer function
Alternate Physical Delivery Address  : All communications must take place through the GETS question and answer function
Alternate Physical Fax Number  : All submissions to be made through the GETS website
Agency Address : NEW ZEALAND
Overview

Refurbishing Block 2 interior spaces, creating Break out spaces in two Classrooms including new sliding doors to joint outdoor learning space and roof replacement including a roof extension to create a new LSC space footprint and a roof extension on an uncovered walkway.

• Refurbish the existing Rooms 2, 3 and 4 in Block 1 of Ngunguru School. The refurbishment includes: Replace floor coverings, installing insulation in the ceiling, install wet area cabinetry and shelving units, install sliding door between rooms 3 and 4, remove folding doors and replace with aluminium sliding doors, change the lighting layout (adding more lights) install a deck and pvc zip clears in front of Rooms 2, 3 and 4.

• Goal: to refurbish Block 2 creating a joint outdoor learning space, LSC office and to make Block 1 an interactive learning space

• The existing Block 1 currently does not have sufficient lighting, the classrooms are quite small, and more storage is required. The deck and Solar View Zip Screens make the classroom larger by allowing the classroom to extend outside.

RFx Outcome

No Winner The contract was awarded to Rob Littlejohn construction ltd (1998)