Tender Closed
|
|
RFx ID : | 24083555 |
Tender Name : | RFT - Main Building Contractor, Refurbish Classrooms/Toilets, Replace Windows/Doors, Fire Alarm System, Refurbish Library, Berhampore School, Wellington |
Reference # : | 5337 |
Open Date : | Wednesday, 17 March 2021 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Wednesday, 14 April 2021 5:00 PM (Pacific/Auckland UTC+12:00) |
Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
All submissions to be made through GETS website. |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
Berhampore School is comprised of single storey buildings predominantly erected in the 1970’s of the C75’s style.
The project is addressing multiple matters across the school in respect of its buildings and infrastructure. The scope of these works is to be tendered in three separate packages:
-SIP refurbish library and develop covered walkway
- Refurbish toilets
- Refurbish classrooms, replace windows and doors and fire detection system
The refurbish library and developed covered walkway works will redevelop the library to make two teaching spaces, complete refurbishment of classrooms 4 and 5 in Block M developing a learning hub and erection of a covered walkway. The work will include new floor finishes, acoustic ceilings, pinboard, wet area joinery and LED lighting.
The refurbish toilets work will replace toilet partitions, vinyl flooring, sanitary fixtures and provide warm water.
The remaining works will complete refurbishment of Block M including new floor finishes, acoustic ceilings, pinboard, wet area joinery, LED lighting. Exterior windows and doors to all classroom blocks and administration will be replaced and a new fire detection and security system installed.
The scheme will be traditionally executed with a full design team employed by the Berhampore School Board of Trustees producing full construction documentation.
This tender has been awarded.