You are not logged in.

RFT - Main Building Contractor, Block 4 Refurbish Classrooms, Blocks 2, 3, 4 Replace Windows/Doors, Toilet Floors at Maoribank School, Upper Hutt

Details

Tender Closed
RFx ID : 23567587
Tender Name : RFT - Main Building Contractor, Block 4 Refurbish Classrooms, Blocks 2, 3, 4 Replace Windows/Doors, Toilet Floors at Maoribank School, Upper Hutt
Reference # : 5332
Open Date : Monday, 9 November 2020 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 2 December 2020 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Manawatu-Wanganui
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All submissions to be made through GETS website.
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address : NEW ZEALAND
Overview

Maoribank School is comprised of timber and fibre cement sheet clad single storey buildings created in early 1970’s. Work will refurbish classrooms, toilets and replace windows on several blocks. The work proposed alters the plan layout to achieve unisex toilet cubicles.

The classroom work includes for fitting of new internal aluminium glazed sliding doors, new carpet and pinboard. The external works is focused on replacing timber windows with double glazed aluminium doors and windows. To all toilets the Terraflake floors will be stripped back and res-surfaced, selected toilet spaces will be repurposed to provide unisex facilities including for all new sanitary fittings.

The work covers multiple buildings mostly of an internal refurbishment nature with the proposed window replacement effecting the exterior. An asbestos report has been commissioned which confirms areas of the exterior cladding to be asbestos. Accordingly, this information is shared with tenderers for them to include for its removal in their offer where affected by the work only, along with an Asbestos Management Plan.

This procurement looks for a professional main building contractor that can employ appropriately experienced staff, competent sub contractors and proven suppliers to deliver a highly performing and robust refurbishment project.

The scheme will be traditionally executed with a full design team employed by the Maoribank School Board of Trustees producing full construction documentation.

RFx Outcome

No Winner No award.