RFT - Main Building Contractor, Block B Refurbish Classrooms/Toilets, Replace Gas Heaters at Clyde Quay School, Wellington

Details

RFx ID : 21819052
Tender Name : RFT - Main Building Contractor, Block B Refurbish Classrooms/Toilets, Replace Gas Heaters at Clyde Quay School, Wellington
Reference # : 5214
Open Date : Friday, 25 October 2019 9:00 AM (Pacific/Auckland UTC+13:00)
Close Date : Wednesday, 20 November 2019 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Manawatu-Wanganui
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All communications must take place through the GETS Question and Answer function
Alternate Physical Delivery Address  : All responses must be uploaded on GETS
Alternate Physical Fax Number  : N/A
Overview

Clyde Quay School is comprised of timber clad single storey buildings, erected spanning years 1940-2004. The work proposed is a continuation of prior work in Block B which seeks to redevelop the toilets creating a breakout space.

The work will in the affected spaces provide new linings and finishes, insulation and glazed openings between spaces. Warm water will be provided to toilets. Timber windows will be replaced with double glazed aluminium.

The work is interior in the majority though the proposed window replacement effects the exterior. An asbestos report is attached. Tenderers are to include for its removal in their offer, in accordance with an Asbestos Refurbishment Survey.

This procurement looks for a professional main building contractor that can employ appropriately experienced staff, competent sub contractors and proven suppliers to deliver a highly performing and robust refurbishment project.

The scheme will be traditionally executed with a full design team employed by the Clyde Quay School Board of Trustees producing full construction documentation.