Create New Account Purchaser Login
Search Tenders
Search
Advanced Search
You are not logged in.

Lead Design for the Masterplanning and Redevelopment of Parakai School

GETS remains operational. If you need support with GETS, contact info@gets.govt.nz. Please be patient as the helpdesk is operating at reduced capacity.

Details

Tender Closed
RFx ID : 21483178
Tender Name : Lead Design for the Masterplanning and Redevelopment of Parakai School
Reference # :
Open Date : Tuesday, 27 August 2019 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date : Thursday, 19 September 2019 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Ministry of Education - Approval from Ministry Employee - ie. Case Manager
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Auckland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Please direct all correspondence through the GETS Q&A function.
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  : N/A
Overview

Lead Design for the Masterplanning and Redevelopment of Parakai School.

The scope of works required is:
- Future Masterplanning is required for a roll of 500 if all current and future building and development projects for the local area are actualised.
- A 811m2 classroom block comprising:
-3 roll growth teaching spaces
-The replacement of two end of life, very poor condition teaching spaces
-The replacement of two leaky teaching spaces (Weathertightness works)
-The replacement/provision of 78m2 of resource space (Weathertightness works) – to be provided as part of the classroom block
- The replacement of a multipurpose hall (Weathertightness works) to masterplan size
- The replacement of the current HDU toilet facility into either the new classroom building or the new multipurpose hall
- The redevelopment of the frontage of the school to address the lack of safe pedestrian access-way from the road into the school grounds, which is currently shared with buses, cars, bikes and pedestrians and improve the parking facilities.
- The upgrade/provision of site infrastructure including electrical, all waters, security, PA, data etc. as required to support the new buildings.