Create New Account Purchaser Login
Search Tenders
Search
Advanced Search
You are not logged in.

RFT - Main Building Contractor for Special Needs Modifications - Universal Bathroom at Plateau School, Upper Hutt

Details

Tender Closed
RFx ID : 21424296
Tender Name : RFT - Main Building Contractor for Special Needs Modifications - Universal Bathroom at Plateau School, Upper Hutt
Reference # : 5213
Open Date : Wednesday, 21 August 2019 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date : Friday, 13 September 2019 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Manawatu-Wanganui
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All queries to be made through the GETS Q&A function
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  : N/A
Overview

Plateau School has a need to create a fully accessible bathroom facility to provide dedicated specialist facilities for students with special health requirements.

An existing art store, which was a student toilet area originally, will be converted into the new bathroom.

The project will also include improvements and upgrade of an existing concrete wheelchair ramp where the gradient will be made compliant and appropriate handrailing will be provided.

The relocation of the art supplies storage facility will incorporate alterations and refurbishment of an existing PE store. Work will include creating internal access to this space from the staff room.

All reconfigured and refurbished spaces will have new floor, wall and ceiling finishes, associated plumbing and electrical alterations and full redecoration. Some fire alarm improvements may also be required.

This procurement looks for a professional main building contractor that can employ appropriately experienced staff, competent sub contractors and proven suppliers to deliver a highly performing and robust refurbishment project.
The scheme will be traditionally executed with a full design team employed by the Plateau School Board of Trustees producing full construction documentation.