You are not logged in.

Main Building Contractors for Block 1 & 11 Alterations - Kirwee Model School - Canterbury

Details

Tender Closed
RFx ID : 20138680
Tender Name : Main Building Contractors for Block 1 & 11 Alterations - Kirwee Model School - Canterbury
Reference # :
Open Date : Wednesday, 12 September 2018 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Wednesday, 3 October 2018 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Registration of Interest (ROI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Canterbury
Required Pre-qualifications : None
Contact : All communications must take place through the GETS Question & Answer function
Alternate Physical Delivery Address  : All submissions must be made through the GETS website
Alternate Physical Fax Number  :
Agency Address : NEW ZEALAND
Related Tenders:
Overview

This Registration of Interest (ROI) is an invitation to suitably qualified contractors to submit a Tender for Main Building Contractors for Block 1 & 11 Alterations at Kirwee Model School - Canterbury

Block 11 has space that is underutilised to the central area of the building which the school wish to alter to consolidate the two toilet areas in to one unisex toilet facility. The current girl’s toilet can then be altered to become a small breakout space, and the cloak area altered to become a larger breakout space, and the store room altered to as required to be used as a small storage / teacher work room. The building is over 10 years old and the classrooms are also needing floor coverings and wall linings to be replaced as they are worn and faded.

Block 1 has been altered in recent years to be two classrooms with a central toilet and breakout space connecting the two spaces with no separation between. The school have found that there is no area for individual or small group learning within the spaces and no acoustic separation between the two classroom spaces. The school wish to create a new central enclosed breakout space separated from the existing classrooms. Sliding doors are planned to be installed within the existing structural openings out to each classroom, and a partition wall with double glazed viewing window to be built separating the toilet access / central work area from the proposed breakout space. An existing window bay is to be removed for a new sliding door is to be installed between structural posts out to the south side of one classroom. New acoustic ceiling tiles are to be installed to address acoustic issues in the two classrooms.

The intention is to complete the work over the Christmas school holiday period.

RFx Outcome

This tender has been completed.

Further information:
The shortlisted suppliers have been taken through to a closed RFP

Date RFx was completed/updated: Thursday, 23 May 2019 9:00 PM (Pacific/Auckland UTC+12:00)