Tender Closed
|
|
RFx ID : | 19074890 |
Tender Name : | Long Bay Primary School - 6 classroom new build and exisiting fitout |
Reference # : | CW17174 |
Open Date : | Friday, 29 September 2017 9:00 AM (Pacific/Auckland UTC+13:00) |
Close Date : | Monday, 30 October 2017 5:00 PM (Pacific/Auckland UTC+13:00) |
Department/Business Unit : | Ministry of Education - Approval from Ministry Employee - ie. Case Manager |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
Jordan Chilcott 021 129 7573 |
Alternate Physical Delivery Address : | |
Alternate Physical Fax Number : | |
Agency Address : | NEW ZEALAND |
This procurement seeks to achieve a new six classroom block and a 3 classroom fitout in an existing block / resource room at Long Bay Primary School. Part of this work also includes a new carpark off the school driveway.
Long Bay School was originally built in 1979 and was an open plan design which has been re-modified into eight teaching spaces. The school site is 2.6800 hectares but the Ministry of Education owns 16.8096 hectares.
It is proposed that works commence as soon as the contract is awarded for this project, with a required completion date of 11 July 2018 (an earlier completion date will also be accepted by the principle).
Long Bay Primary School is for Year 1 – 6 students. The land around the school is undulating - the school is situated on two levels, the upper terrace at around 30 mRL contain the school buildings, the lower terrace with the sports field at around 21mRL. The two levels are separated by a moderately sloped grassed bank. The initial Geotechnical investigation has shown that ground conditions are similar at all test locations, with depth torock being the only varying feature.
There are 2 separable portions under the Long Bay Primary School Contract. Separable portion number 1 is for a three-classroom fit out in the existing school. The required completion date for separable portion 1 is 26th of January 2018. Separable portion number 2 is for the 6-classroom new block being built at the southern end of Long Bay Primary School. The required completion date for separable portion 2 is the 11th of July 2018.
This tender has been awarded to: