| RFx ID : | 35714670 |
| Tender Name : | ODC Cont 290 - Otara Road Watermain Renewal [DN355PE] 2026 |
| Reference # : | C4/456 |
| Open Date : | Friday, 27 November 2026 5:00 PM (Pacific/Auckland UTC+13:00) |
| Close Date : | Tuesday, 22 December 2026 2:00 PM (Pacific/Auckland UTC+13:00) |
| Tender Type : | Request for Tenders (RFT) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
Project Coordinator Service.Delivery@odc.govt.nz |
| Alternate Physical Delivery Address : | 108 St John Street |
| Alternate Physical Fax Number : |
Council is seeking a highly successful relationship that optimises the value of the Contract to both parties.
Without compromising the Contractual obligations of the parties under the General Conditions of Contract,
Council seeks a high level of partnering and collaboration between the Council and Contractor aimed at
achieving high performance, best value, managed Contract risk, completion of works in accordance with the
contract specification and innovative solutions.
This Contract involves the installation of a DN355 PE100 watermain in the south-western roadside of Otara
Road, between the Otara Road booster pump station (No. 470 Otara Road) and the pipeline interconnection
approximately 20 metres north of the intersection with Clark Cross Road.
The pipeline comprises approximately 300m of DN355 PE100 SDR11 from the booster pump station and
approximately 1,760m of DN355 PE100 SDR13.6 through to Clark Cross Road. It is to be installed by open
trench to the specified grades, apart from one directional drill of approximately 50m (DN355 PE100 SDR11)
beneath a stormwater culvert at Ch A-497m.
The works also include the connection arrangements at the Otara Road booster pump station (Detail 01) and at
Clark Cross Road (Detail 02), air valves, scour valves and hydrants, the transfer of property service connections
from the existing DN300 PVC main, removal of sections of the redundant DN300 PVC and decommissioned
DN225 steel mains, and the testing, disinfection and commissioning of the new main.
The new main runs close to the live DN300 PVC watermain, which must remain in service throughout
construction, and crosses 11kV overhead and underground power lines in several locations. Staged
construction and commissioning, careful shutdown planning and close coordination with Council's Water
Supply Operations team are central to this Contract.