You are not logged in.

Expression of Interest - Wellington ETCS Lineside Contractor

Details

Tender Closed
RFx ID : 29036040
Tender Name : Expression of Interest - Wellington ETCS Lineside Contractor
Reference # :
Open Date : Friday, 15 March 2024 5:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 16 April 2024 5:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Registration of Interest (ROI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 32151500 - Control indicating and signaling devices
  • 72141600 - Mass transit system construction services
  • 78101600 - Rail cargo transport
  • 78111600 - Passenger railway transportation
Regions:
  • Wellington
Required Pre-qualifications : None
Contact : Graham Allen
graham.allen@kiwirail.co.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

The Wellington Metro Resignalling project (or Wellington ETCS) is a project to develop and then deliver the modernisation of the Wellington Rail Network signalling and operational systems. The objectives are to reduce risk and increase capacity of Wellington’s rail network, so it can meet the planned need for sustainable transport. This project is planning to install Level 2 ETCS (European Train Control System) with Automatic Train Protection and in-cab signals to replace lineside signals.

This EOI is issued by KiwiRail through its Future Rail Systems business operation for the purpose of shortlisting up to four (4) Respondents to participate in a Competitive Dialogue (CD) and RFP process for the role of Wellington ETCS Lineside Contractor.

RFx Outcome

This tender has been completed.

Further information:
KiwiRail is now able to confirm that a funding decision for the Wellington ETCS project is unlikely before the 2026/2027 financial year.
Once a decision on funding and the speed of advance is made, KiwiRail will reassess the project and determine future procurement requirements at that time. These will most likely be met by a new procurement process tailored to those requirements, hence the decision to formally cease the current effort.

Date RFx was completed/updated: Tuesday, 24 February 2026 10:44 AM (Pacific/Auckland UTC+13:00)