You are not logged in.

Advance Notice (3) Design & Build Construction Services for Masterton Maintenance Depot

Details

RFx ID : 31997629
Tender Name : Advance Notice (3) Design & Build Construction Services for Masterton Maintenance Depot
Reference # :
Open Date : Friday, 4 July 2025 12:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Tuesday, 30 September 2025 5:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Notice of Information (Advance Notice) (NOI)
Tender Coverage : Sole Agency  [?]
Categories :
  • 22000000 - Building and Construction Machinery and Accessories
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Wellington
Required Pre-qualifications : None
Contact : Karen Morris
tenders@gw.govt.nz
00000000
Overview

This is an Advance Notice to inform suppliers of the anticipated timeline for the upcoming tender for a Masterton Maintenance Depot that will be procured for the Lower North Island Rail Integrated Mobility (LNIRIM) programme.

Further to the advanced notice issued in August 2024 (GETS Ref 30101916) and updated in March 2025 (GETS Ref 31334130), Greater Wellington Regional Council (GWRC) are notifying suppliers of the anticipated date of release for the Masterton Maintenance Depot Request for Proposal.

GWRC are currently intending to issue the Maintenance Depot Request for Proposal in September 2025 and confirm the preferred contractor before the end of 2025. The Maintenance Depot is required to be ready for commissioning with a new train by February 2028, with Practical Completion anticipated in April 2028 following successful commissioning.

The scope of works remains as per the previous advanced notices: detailed design of the provided concept, building consent application, resource consent application, enabling works, construction and commissioning using one of the new trains. It is anticipated that alternative designs to the building structure and/or finishes may be considered provided that any alternative does not impact the location, layout and maintenance activities to be performed.

There are no documents with this notice. It is provided for your information only.