Burgess Access Bridge Replacement (Design and Construct)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 33195279
Tender Name : Burgess Access Bridge Replacement (Design and Construct)
Reference # : 25-91
Open Date : Wednesday, 10 December 2025 3:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Wednesday, 11 March 2026 3:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72140000 - Heavy construction services
Regions:
  • Gisborne
Exemption Reason : None
Required Pre-qualifications : None
Contact : Questions submitted via GETS
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

This project is part of Gisborne District Council's recovery programme of works following the damage caused by Cyclone Gabrielle.

GDC requires a Contractor who has the expertise, experience and resources to construct the replacement Burgess Bridge. The Contract Works includes:
- Design and construction of a new single-lane Burgess Access Bridge over the Hangaroa River, including all structural elements such as foundations, abutments, piers (if required), scour protection, deck, barriers, surfacing, and transition works.
- The Contractor is responsible for selecting the bridge type, span arrangement, structural form, foundation system, and materials whilst ensuring compliance with the Principal’s Design Criteria.
- The design and construction of road approach works, which include earthworks, road geometry, pavement structure, surface drainage, signage, safety barriers, and tie-ins to the existing road network, all in accordance with the performance requirements set out in the Principal’s Design Criteria.
- The design and construction of all necessary retaining structures to support road embankments, bridge approaches, and associated earthworks.
- Preparation and submission of all required Producer Statements (PS1–PS4) and supporting documentation.
- Full preparation, submission and responsibility for obtaining requisite Statutory Approvals (including resource consent and building consent) for the project.

Please refer to the attached RFT documents for further information.