You are not logged in.

C-1232 Waipukurau Transfer Station Weighbridge

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 26228395
Tender Name : C-1232 Waipukurau Transfer Station Weighbridge
Reference # : C-1232 Restricted Tender
Open Date : Thursday, 25 August 2022 4:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Tuesday, 20 September 2022 4:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72100000 - Building and facility maintenance and repair services
  • 72120000 - Nonresidential building construction services
  • 72140000 - Heavy construction services
  • 72150000 - Specialized trade construction and maintenance services
  • 77100000 - Environmental management
Regions:
  • Hawke's Bay
Exemption Reason : None
Required Pre-qualifications : None
Contact : Heather Flanagan
heather.flanagan@chbdc.govt.nz
0273760014
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

Contractors scope for the works is generally as follows:
• Install site fencing, barriers, signage, controls such as required for the safe execution of works and for compliance with relevant New Zealand Legislation. Particular hazards include but are not limited to the protection and exclusion of public, working at heights, safety from falling, operation and working around heavy machinery.
• Traffic Management allowing access to transfer station and wastewater treatment plant while works are occurring.
• Commitment to realising sustainable procurement opportunities
• Collaborative and proactive approach
• Health and Safety, Quality and Environmental Management
• Full reinstatement of pavement, surfacing, paved areas, kerb and channel, footpath and berm as applicable
• Protect items that are to remain, make good any damage to existing, clean and tidy site
• Prepare and implement Construction Methodology for the safe execution of works
• Carry out all temporary works design
• Establish temporary services as required for the execution of works.
• Carryout all works as required for the installation of weighbridge and siteworks, all as shown, indicated and implied by the drawings, as well as all associated works such as demolition, supply and delivery, installation and commissioning of all materials, labour, fittings, plant etc, necessary for full completion of the works described.
• Handover in good working order, complete with all instructions necessary for the correct operation and maintenance of the facility.
• Opportunity to improve access, usability and layout of the transfer station.

RFx Outcome

No Winner