You are not logged in.

MajSC141 Mairs Bridge strengthening

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 33450564
Tender Name : MajSC141 Mairs Bridge strengthening
Reference # :
Open Date : Monday, 9 February 2026 12:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 10 March 2026 3:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • West Coast
Exemption Reason : None
Required Pre-qualifications : None
Contact : Procurement Officer
procurement@bdc.govt.nz
0800 807 239
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Mairs Bridge #107 is situated on Westbank Road, an arterial route serving various rural properties and farmland in the Maruia area of the Buller region. The strengthening and repair works to Mairs Bridge will aim to increase the load capacity of the structure and prevent the implementation of a posting at the structure’s location. In addition, it will also upgrade and extend the working life of the structure allowing time to secure funding for a full bridge replacement.
This procurement seeks to obtain a capable and competent supplier to work alongside the Principal and Principals agents and carry out the physical works as prescribed to a quality standard, within timeframe and budget.
This RFT is a measure and value contract and is for strengthening and repairs to Mairs Bridge #107 on Westbank Road. The physical work consists of the following items:
• Establishment and disestablishment.
• Temporary traffic management and planning.
• Access and containment.
• Location and protection of prescribed utilities.
• Installation of bracing between beams at the midspan of each span.
• Removal of existing surfacing and installation of plywood members and timber running planks across the length of the structure.
• Augmentation of the existing abutment piles with reinforced concrete.
• Repair / strengthening of decayed corbels.
• Any other works described or implied in the specifications and construction drawings.