Upper Hutt College - Old River Gym, Wharenui & MRC - Reroof & Interior Works

Details

RFx ID : 34815704
Tender Name : Upper Hutt College - Old River Gym, Wharenui & MRC - Reroof & Interior Works
Reference # :
Open Date : Monday, 31 August 2026 4:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Monday, 28 September 2026 5:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : All enquiries to be made through the GETS website
Alternate Physical Delivery Address  : All submissions to be made through the GETS website
Alternate Physical Fax Number  :
Overview

The Contract Works include:

General:
Prepare and implement all site-specific Health & Safety documentation, including the SSSP. Establish and maintain the site, including access, security, protection of occupied areas, and temporary works.

Old River Gym Roof (Block G):
• Remove existing pop-top ridge vent and permanently weatherproof the opening.
• Replace translucent roofing sheets with new trafficable translucent sheets, including all associated flashings and fixings.
• Complete all associated roof reinstatement and making-good works.

MRC Roof (Block G):
• Install new membrane roofing over tapered PIR insulation.
• Provide new gutters, flashings, rainwater heads, outlets, and downpipes.
• Install additional roof cavity ventilation above Room 15.
• Ensure all roofing interfaces and penetrations are fully weathertight.

MRC Room 15 (Block G) Internal Remediation:
• Undertake asbestos removal, testing, monitoring, clearance certification, and disposal of contaminated materials.
• Remove damaged ceilings, wall linings, mould-affected materials, services, fixtures, and hot water cylinder.
• Allow a $5,000 + GST Provisional Sum for replacement of any decayed timber framing.
• Reinstate with new wall and ceiling linings, vinyl flooring, plumbing and electrical services.
• Complete mould treatment, painting, final cleaning, and handover ready for occupation.

Wharenui Roof (Block J)
• Remove and reinstate plywood cladding as required for new apron flashings.
• Replace the existing walkway roof and fascia guttering.
• Demolish the existing dormer and complete all associated roofing, cladding, framing, and reinstatement works.

Completion Requirements:
Complete all associated making-good works. Obtain all required approvals and comply with NZ Building Code, Ministry of Education requirements, and relevant regulations. Provide producer statements, warranties, O&M manuals, as-builts, and practical completion documentation. Deliver the works in a fully operational, weathertight, and defect-free condition.