You are not logged in.

Main Contractor for Swimming Pool Repairs and New Filtration at Bream Bay College

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 34656330
Tender Name : Main Contractor for Swimming Pool Repairs and New Filtration at Bream Bay College
Reference # : 261155
Open Date : Friday, 14 August 2026 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 11 September 2026 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Board of Trustees - Approve by BoT - ie. School Principal
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Northland
Exemption Reason : None
Required Pre-qualifications : None
Contact : All communications must take place through the GETs Question and Answer function.
All communications must take place through the GETs Question and Answer function.
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The scope of this project is to repair the swimming pool which is currently leaking and to install a new filtration system that is fit for purpose. We are open to options for this repair and replacement but believe the following will be required:
Grinding – Removal of all existing pool paint, address and repair all the cracks on the floor and walls. (Full containment of grinding particulates will need to be addressed in the Health and Safety response by each tenderer)
Scaffolding / Wrap / cover – If required (due to weather constraints) wrap thepool once grinding is complete.
Demolition – Removal of old ring main filtration system and returns.
Prep work on Pool – Grind out all cracks that are on the pool floor and wall surfaces, seal and epoxy and fibreglass over. Pool capping pathway cut back and re-concreted to the same height. Centre of the pool to be cut and remove the drainage. Steel cage to reset in the
centre concrete. Pour and flash with top of pool floor. Polyethene DPM to floor with reinforcing mesh.
Concrete and Plaster – Pool to be resurfaced with a 3 coat system. Final solid plaster coat to be applied right around the swimming pool for smooth finish for painting. Concrete floor to be 75-100mm thick, Plaster to be 40mm thick, Plaster will have a cure time of 21 days before first coat of primer.
New Ring Filtration System – PVC pipe holes drilled every 500mm apart. 8mm threaded fittings drilled and taped. 8mm PU pipe extending through concrete. Reinforcement and trimmed once concrete is poured over and painted. Each side of the ring main separated by each pump, so 2 new pumps in pool shed.
Paint – Prime surface and apply 3 coats of epoxy paint. Paint black lines on base of swimming pool.
The outcome sought is a functioning school swimming pool with no leaking and a new fit for purpose filtration system that will future proof the pool for years to come. Proposed solutions to make this happen are sought from qualified pool filtration and pool construction experts.


CROWN COPYRIGHT © 2026