Seaview Wastewater Treatment Plant – Stage 3

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 33609200
Tender Name : Seaview Wastewater Treatment Plant – Stage 3
Reference # :
Open Date : Friday, 27 February 2026 3:30 PM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 27 March 2026 12:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : Natasha de Jong
procurement@wellingtonwater.co.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The Seaview Wastewater Treatment Plant (WWTP) is a currently undergoing a programme of upgrades to improve performance, regulatory compliance risk and to better align with community expectations. Part of this programme includes the upgrade of the existing blower units, diffuser and pipework, which is currently at risk of failure due to its age and insufficient capacity for future peak process load.

Wellington Water wishes to appoint a Supplier to:
• Installation of the four new blowers (free issModification of the associated air discharge pipework (including any associated seismic and gravity support elements) at the WWTP to accommodate the new blowers.
• Installation of a new control panel for the electrical and control instrumentation associated to the new blowers.
• PLC programming and integrate the new blowers into the existing control system.
• Modification of the existing blower building elements to suit the new blowers room layout.
• Replacement of the existing diffuser grids for each of the four CST trains at the WWTP.
• Install the new structural steel maintenance platforms and handrail system around the new DO controls for the CST area at the WWTP.
• Provisional sum of the grating system for the New Maintenance Platforms.ued by the principal) and replace the three existing blowers in the blower building at the WWTP.