Slope Stabilisation Works (Retaining Wall) Lennel Rd (outside 24 Upper Watt St), Wadestown

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 27550099
Tender Name : Slope Stabilisation Works (Retaining Wall) Lennel Rd (outside 24 Upper Watt St), Wadestown
Reference # : 114.00282
Open Date : Friday, 16 June 2023 10:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 21 July 2023 12:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : Gary Cooper
wccprocurementtender@wcc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

This Request for Tender (RFT) is an invitation to suitably qualified suppliers to submit a Tender for the Proposed Slope Stabilisation Works (Lennel Rd, outside 24 Upper Watt St, Wadestown) contract opportunity.

The slope stabilisation works are intended to protect the road and footpath along Lennel Road from debris inundation, as well as the dwelling at 24 Upper Watt Street located above the landslide.
The proposed remedial works comprise construction of an anchored retaining system across the landslide face area (up to approximately 20 m wide and 16 m high). The top section of the retaining system (approximately 4 m high) will have a shotcrete face, this will extend to the property boundary between private and WCC land. The remaining face area will have a steel mesh facing.

The successful Respondent will be experienced and have a track-record in landslide remediation/stabilisation construction of these types. They must have adequate capability and capacity assigned to this project to meet the programme deliverables.