Hautapu Road Urbanisation and Roundabout Project [Stage 1]

Details

RFx ID : 32853063
Tender Name : Hautapu Road Urbanisation and Roundabout Project [Stage 1]
Reference # : 291608
Open Date : Q4 2025
Indicative RFx Release Date  : Q4 2025  [?]
Tender Type : Future Procurement Opportunity (FPO)
Project Status : Confirmed  [?]
Expected number of contracts offered : 1
Tender Coverage : Sole Agency  [?]
Categories :
  • 81101500 - Civil engineering
Regions:
  • Waikato
Required Pre-qualifications : None
Contact : Mahendra Kumar
Mahendra.kumar@waipadc.govt.nz
Overview

Waipa District Council is proposing to issue a Registration of Interest (ROI) for pre-qualification to identify contractors capable of delivering construction works associated with the following project stages:
Stage 1: Hautapu Road Urbanisation Works from Peake Road Intersection to 44 Hautapu Road (2025/2026 season)
• Site preparation works
• Construction and installation of cirtex soakage units
• Construction of stormwater reticulation network
• Upgrading of Swales
• Installation of water supply pipes
• Installation of wastewater raising main
• Improvements at the existing intersection of Hautapu Road and Allwill Drive, including:
✓ Installation of traffic signals and associated pavement widening.
✓ Pavement reconstruction in existing pavement areas within the intersection footprint.
✓ Utility service relocations required for the works within the intersection site area (Waipa Networks - undergrounding of powerlines).
• Construction of kerb and channels
• Pavement reconstruction
• Road signs and markings
• Streetlighting.
• Construction of shared pathway - Walking and cycling facilities at the intersection, including two signalised pedestrian crossing points.
• Completion, commissioning, and hand over.

Stage 2: Works from 44 Hautapu Road to the proposed roundabout at the SH1B Victoria Road / Hautapu Road intersection (timing to be confirmed)
• Site preparation works
• Utility service relocations within the roundabout site area (Chorus, Tuatahi First Fibre, and Firstgas).
• Construction and installation of cirtex soakage units
• Construction of stormwater reticulation network
• Installation of water supply pipes
• Pavement widening and reconstruction within the roundabout footprint.
✓ Dual circulating lanes.
✓ Cul-de-sac to maintain access to businesses located on Hannon Road.
✓ Intersection improvements at SH1B Victoria Road and Laurent Road.
• Construction of kerb and channels
• Pavement reconstruction
• Road signs and markings
• Streetlighting.
• Construction of shared pathway – These paths will connect to existing cycling and walking facilities at the roundabout and intersection.
• Completion, commissioning, and hand over.

We hope to release the ROI in November.