You are not logged in.

2813 - Stafford Street and Barnard Street Water Services Renewal

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 34871022
Tender Name : 2813 - Stafford Street and Barnard Street Water Services Renewal
Reference # : 2813
Open Date : Monday, 7 September 2026 10:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Thursday, 1 October 2026 12:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Canterbury
Exemption Reason : None
Required Pre-qualifications : None
Contact : Amanda Taylor
amanda.taylor@timdc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Timaru District Council (TDC) is seeking a suitably experienced contractor to deliver the Stafford Street and Barnard Street Infrastructure Replacement project. The successful Tenderer will complete detailed design, supply materials, undertake construction, testing and commissioning and hand over of all installed infrastructure assets. The following bullet point list, is a non-exhaustive summary of the extent of work to be undertaken under this Contract. For more information on the extent of works, refer to the Principal’s Requirements.
• Complete detailed design, to further the Principal’s preliminary design information.
• Prepare design resources including Detailed Design Report; Detailed Design Drawings; Specifications, Safety in Design records, tracking documents and design endorsements.
• Coordinate with TDC, the Engineer, the Road Controlling Authority, Network Utility Operators, other contractors, businesses, property owners and the public.
• Construct the identified water supply, wastewater and stormwater network works on Stafford Street and Barnard Street.
• Install raingardens and associated stormwater structures.
• Maintain continuity of reticulated services and manage any planned interruptions through approved procedures.
• Complete all works for Barnard Street Reticulation Improvements by the end of the 2026 calendar year and all works for Stafford Street Reticulation Improvements by the middle of February 2027.


Crown Copyright © 2026