RFT2763 - Jonas Street Stormwater Improvement and Water Renewals (Grasmere St to Waimataitai Culvert)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 33606140
Tender Name : RFT2763 - Jonas Street Stormwater Improvement and Water Renewals (Grasmere St to Waimataitai Culvert)
Reference # : 2763
Open Date : Friday, 27 February 2026 12:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 26 March 2026 12:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Canterbury
Exemption Reason : None
Required Pre-qualifications : None
Contact : Nigel Howarth
nigel.howarth@timdc.govt.nz
02102506949
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

TDC is seeking a contractor to install approximately 127m of new DN125 PN12.5 PE100 watermain in a new alignment and 122m of new DN600 concrete pipe at the proposed abandoned DN100 cast iron watermain along Jonas St.
The work includes, but is not limited to:
• Site establishment and set-out.
• Contract supervision, project management, and quality assurance.
• Implementation of the approved Health & Safety Plan, Traffic Management Plan (TMP), and Erosion & Sediment Control Plan (ESCP).
• Identification, protection, and support of all existing underground and overhead services, including liaison with utility authorities and affected property owners.
• Supply, welding, and installation of approximately DN125 PN12.5 PE100 watermain, including all fittings, bends, tees, reducers, thrust blocks, and connections to existing reticulation as per drawings and specifications.
• Supply and installation of sluice valves, fire hydrants, rider mains, service connections (including lateral replacements and new manifolds/toby boxes) and new valve boxes.
• Supply and install new DN600 concrete main in the proposed abandoned watermain, removal and dispose of the cast iron watermain in the trench.
• Construction and formwork of the concrete structure connection to the existing DN2250 concrete stormwater main.
• Installation of 3 concrete manholes.
• Testing, flushing, chlorination, microbiological testing and commissioning of the new watermain as per TDC requirements.
• Flushing, water test and CCTV of the new stormwater pipes and manholes as per TDC requirements
• Completion of as-built drawings.
• Reinstatement of all disturbed areas including roads, footpaths, berms, driveways, and private property in accordance with TDC standards.
• Site disestablishment and demobilisation.