Hunter Street Water Supply Pipe Renewal

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 34571972
Tender Name : Hunter Street Water Supply Pipe Renewal
Reference # : PJ70044
Open Date : Tuesday, 28 July 2026 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Thursday, 10 September 2026 4:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : All of Government  [?]
Categories :
  • 83100000 - Utilities
Regions:
  • Taranaki
Exemption Reason : None
Required Pre-qualifications : None
Contact : Armand Aguja
armand.aguja@stdc.govt.nz
02102921826
Alternate Physical Delivery Address  : N.A.
Alternate Physical Fax Number  : N.A.
Overview

The South Taranaki District Council (STDC) proposes to renew sections of the water supply reticulation network along Hunter Street, Hawera, between Waihi Road (SH3) and South Road (SH45), to address aging asbestos cement (AC) pipelines and maintain required levels of service. The works include the decommissioning, or abandonment of approximately 618 m of existing DN100 AC water mains and the replacement with new DN180 HDPE pipelines.

In addition to the main renewal works, rider mains will be installed to service properties where required. These rider mains will be constructed using DN63 HDPE pipe to provide an efficient alternative to individual service crossings.

The scope of works includes the supply and installation of all necessary valves, fittings, fire hydrants (PN16 or higher), and service connections, along with integration into the existing network and recently installed valves and fittings to ensure continuity of supply, including maintaining service to critical customers such as the nearby hospital.

The new pipelines will be installed using open trenching methods, adapted to suit site conditions, traffic management requirements, and existing underground services. The works also include flushing, pressure testing, disinfection, and commissioning of the new water mains prior to being placed into service.

Additional deliverables include full reinstatement of all disturbed surfaces (including roads, berms, footpaths, and pavement markings), and the provision of as-built drawings, asset data, componentisation records, and supporting QA documentation in accordance with Council requirements to support asset management and future maintenance.