You are not logged in.

Scion campus emergency power supply network main contractor for construction services

Details

Tender Closed
RFx ID : 19789164
Tender Name : Scion campus emergency power supply network main contractor for construction services
Reference # :
Open Date : Wednesday, 6 June 2018 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Tuesday, 3 July 2018 3:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : On behalf of procurement agent  [?]
Categories :
  • 26000000 - Power Generation and Distribution Machinery and Accessories
  • 30000000 - Structures and Building and Construction and Manufacturing Components and Supplies
  • 39000000 - Electrical Systems and Lighting and Components and Accessories and Supplies
  • 72000000 - Building and Facility Construction and Maintenance Services
Regions:
  • Auckland
  • Bay of Plenty
  • Hawke's Bay
  • Waikato
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : John Meredith
john.meredith@rdtpacific.co.nz
021684493
Alternate Physical Delivery Address  : RDT Pacific, 1270a Ranolf Street, Rotorua
Alternate Physical Fax Number  :
Agency Address : NEW ZEALAND
Overview

New Zealand Forest Research Institute (NZFRI), (the Client) trading as Scion, is seeking to procure construction services for the delivery of an upgrade to the campus emergency power supply network.

The objective of this procurement is to engage a suitably qualified and experienced Contractor (the Contractor) with a strong background in electrical engineering and on-site project management with a good track record in complex electrical engineering projects.
The project consists of a new modified system where the existing ES (Emergency Supply) system is extended from one centralised generator to four generators servicing the campus. They are:
1) New Generator 1 – 300kVA
2) New Generator 2- 500kVA
3) New Generator 3 - 100kVA
4) Re-use of the existing 250kVA generator
5) Modifications to switchboards and cable routes to align the generator supplies with the transformers that are part of the normal supply in those areas.

The project will be a turn-key where the contractor will be responsible for the inputs and delivery of multiple parties including switchgear manufacturers, generator suppliers and the required controls interfaces. All parties will be appointed by the electrical contractor.

RFx Outcome

No Winner Closing off old opportunities transferred over by GETS