CON 26-15 Stewart Island/Rakiura energy project - Stage 1

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 33679144
Tender Name : CON 26-15 Stewart Island/Rakiura energy project - Stage 1
Reference # : CON 26/15
Open Date : Wednesday, 11 March 2026 10:00 AM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 10 April 2026 4:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • The United Nations Standard Products and Services Code (UNSPSC)
Regions:
  • Southland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Ryan Donnelly
ryan.donnelly@southlanddc.govt.nz
0800 732 732
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Southland District Council is looking for Suppliers who can complete vegetation clearing over approximately 2.7 hectares at the old gun club site, Airport Road, Stewart Island.
Note this site is mostly regenerated forestation and being a “Hail Site” no in-situ material to leave the site.
Scope of works would include:
• Vegetation clearance for approximately a 3-hectare site.
• Clearance of bush (mostly regenerated forestation) including roots, to prepare the ground ready for the solar energy install.
• The removal and cutting to manageable lengths of any trees deemed suitable for firewood. This timber may leave the site for local supply.
• Root raking of stumps, chipping and mulching of the vegetation for disposal onsite. Locations for respreading and or windrowing of this material is to be confirmed.
Note: There is to be no burying or burning of vegetation waste.
• Prepare the proposed site perimeter for the installation of fencing, approximately 3m wide.
• Install deer fencing (6” netting and timber posts) along the prepared site perimeters.
• Install double deer gates at the site access point on Airport Road.
Note: For information only, there is a fencer established on the island that contractors may wish to engage with.
• A company with robust health and safety systems that are or will be willing to sign onto the Southland District Council’s prepared contractor’s agreement register.
• The works are required to be completed by 30 June 2026.
Note: No work will be allowed to commence prior to the resource consent being granted for the site. The client has this in progress currently, should this be delayed beyond expectations the Contract programme would be revised in consultation with the successful contractor.