You are not logged in.

1461 - Stratford Raw Water Delivery Line and Grit Tank Construction

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 32692655
Tender Name : 1461 - Stratford Raw Water Delivery Line and Grit Tank Construction
Reference # : 1461
Open Date : Monday, 6 October 2025 5:30 PM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 13 November 2025 2:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Assets
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 26121500 - Electrical wire
  • 26121600 - Electrical cable and accessories
  • 30111500 - Concrete and mortars
  • 30111900 - Concrete reinforcement hardware
  • 39120000 - Electrical equipment and components and supplies
  • 72121400 - Specialized public building construction services
  • 72151100 - Plumbing construction services
  • 72151500 - Electrical system services
  • 72152700 - Concrete installation and repair services
  • 72154000 - Specialty building and trades services
  • 72154400 - Pipefitting fabrication and maintenance services
  • 83101500 - Water and sewer utilities
  • 83101800 - Electric utilities
  • 95121800 - Utility buildings and structures
Regions:
  • Taranaki
Exemption Reason : None
Required Pre-qualifications : None
Contact : Sam Jiggins
sjiggins@stratford.govt.nz
067656099
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Council supplies potable drinking water to the Stratford Township which is sourced from the Pātea River and Konini Stream, and treated at the Water Treatment Plant (WTP) on Cardiff Road.
Due to the condition and age of the existing raw water line from the Pātea River and subsequent grit tank, Council is undertaking to renew these assets.

The successful Contractor shall supply and construct all the deliverables for the renewal of the Pātea River raw water delivery line and grit removal tank that feeds the Raw Water Pump Station at the WTP. All works shall include all pipework, electrical installation, instrumentation, commissioning, calibration and integration of the new systems with the existing infrastructure, as well as the provision of training on the new systems to the plant operators.