2026-10882 East Taieri Lower Pond Structure Upgrades

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 33535788
Tender Name : 2026-10882 East Taieri Lower Pond Structure Upgrades
Reference # : 2026-10882
Open Date : Thursday, 19 February 2026 8:30 AM (Pacific/Auckland UTC+13:00)
Close Date  : Tuesday, 31 March 2026 4:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Engineering
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 70000000 - Farming and Fishing and Forestry and Wildlife Contracting Services
  • 77000000 - Environmental Services
  • 83000000 - Public Utilities and Public Sector Related Services
  • 93000000 - Politics and Civic Affairs Services
Regions:
  • Otago
Exemption Reason : None
Required Pre-qualifications : None
Contact : Courtney McCaig
engineering.procurement@orc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

This opportunity involves the remediation of the Lower Pond gravity gates and its associated structure, located in Allanton.

During routine inspection of the floodbanks in early August 2021, Operations staff identified a hole that had opened behind the gabion basket headwalls on the Taieri River side of the Lower Pond Gravity Gates. Upon further inspection it was discovered that corrosion of one of the culverts (at invert level) had allowed water to track through the floodbank and into the culvert behind the gravity gates. A sinkhole has then opened to the surface between the two gravity gates, immediately behind the gabion basket headwall.

A repair was carried out to mitigate the risk of flows through the floodbank as a result of the corroded culvert inverts and sinkhole. This involved filling the void behind the gabion baskets, between the two culverts, with flowable fill, and sealing the base of both culverts with concrete.

This project is located on an operational farm and involves work on flood protection infrastructure that is critical in protecting high value farmland, property, and strategic assets from flood hazard. The work will require careful planning and coordination to meet the needs of the client and landowner in minimising adverse effects on the farming operations and maintaining effective flood protection measure over the duration of the works.