You are not logged in.

2024-10075 - Balclutha Relief Wells Remediation

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 28961795
Tender Name : 2024-10075 - Balclutha Relief Wells Remediation
Reference # : 2024-10075
Open Date : Wednesday, 6 March 2024 5:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 12 April 2024 5:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Engineering
Tender Type : Request for Quotations (RFQ)
Tender Coverage : Sole Agency  [?]
Categories :
  • 20140000 - Oil and gas operating and production equipment
  • 70171800 - Drainage services
  • 77000000 - Environmental Services
  • 83000000 - Public Utilities and Public Sector Related Services
  • 93000000 - Politics and Civic Affairs Services
Regions:
  • Otago
Exemption Reason : None
Required Pre-qualifications : None
Contact : Courtney Stevens
engineering.procurement@orc.govt.nz
0272240743
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The Otago Regional Council (ORC) currently maintains a number of flood banks and associated structures across the Otago region. This section of work is located in Balclutha on the true right of the Clutha River/Mata-Au flood bank. During the February 2020 flood event, two relief wells showed signs that there may have been failure of these wells. One well indicated subsidence and the other significant discharge of sediment. Annual well inspections determined that approximately 1 m of sediment had built up in many if the wells as a result of the 2020 Flood.
This opportunity involves the following work:
• Replace wells numbered 3, 7 and 9 each with two new adjacent wells in accordance with the repair design included in the T+T 2020 report.
• Repair or replace wellheads at wells 5 and 17b where PVC wellheads are broken.
• Undertake grouting of the base of all existing wells to reduce the potential for sediment inwash. This will likely prolong the life of the wells and reduce the potential for the wells to become blocked with sediment via the base in future floods.
The work will require careful planning and coordination to minimise adverse effects on the environment and maintain flood protection measures over the duration of the works.