You are not logged in.

Sewer Reticulation Renewals 2020 - 2023

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 22553160
Tender Name : Sewer Reticulation Renewals 2020 - 2023
Reference # : 3/23/2245
Open Date : Friday, 17 April 2020 1:30 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 15 May 2020 4:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Waikato
Exemption Reason : None
Required Pre-qualifications : None
Contact : Blaze Tanner
btanner@mpdc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Related Tenders:
Overview

Contract No. 2245 Sewer Reticulation Renewals 2020 - 2023

This is a multi-year contract that will span over the course of 3 financial years (2019/20, 2020/21 and 2021/22), each year beginning in July and finishing in June. Matamata-Piako District Council have approximately $1,500,000.00 available each financial year (as specified in the Long Term Plan 2018 - 28). SoP rates will be used to compile a programme of works with the successful Contractor.

This contract is primarily a sewer line rehabilitation contract and is anticipated to involve relining with the possibility of directional drilling, pipe thrusting and open excavations. This contract will also include minor repairs, pipe replacement, manhole rehabilitation, catchment and asset assessments (e.g. smoke testing, condition inspections), scoping works and other ancillary work. Construction is anticipated to start March 2020 and conclude June 2023.

The tender closes at 4.00pm on Friday 15 May 2020.

RFx Outcome

No Winner Contract No. 2245 Sewer Reticulation Renewals 2020-2023

This contract is primarily a sewer line rehabilitation contract and is anticipated to involve relining with the possibility of directional drilling, pipe thrusting and open excavations. This contract will also include minor repairs, pipe replacement, manhole rehabilitation, catchment and asset assessments (e.g. smoke testing, condition inspections), scoping works and other ancillary work. Construction is anticipated to start July 2020 and conclude June 2023.

On 4 August 2020 this was awarded to HydroTech Limited in the sum of $3,007,198.35 (excluding GST) using Weighted Attribute method. Four other conforming tenders were received.