DWR for Tier 1 Demolition of the Former Masterton Hospital

Details

Tender Closed
RFx ID : 21552689
Tender Name : DWR for Tier 1 Demolition of the Former Masterton Hospital
Reference # : 2019-21
Open Date : Friday, 6 September 2019 4:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 8 November 2019 12:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Quotations (RFQ)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72111000 - Single family dwelling construction services
  • 72111100 - Multiple unit dwelling construction services
  • 72141500 - Land preparation services
Regions:
  • Manawatu-Wanganui
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : Hunter Stivens
hstivens@linz.govt.nz
021317115
Alternate Physical Delivery Address  : LINZ offices, 112 Tuam Street Private Bag 4721, Christchurch 8140, New Zealand
Alternate Physical Fax Number  :
Overview

Following Stage 1, and the identification and prequalification of suitable Respondents to form each of the two panel tiers; LINZ is proposing to identify a Tier one (1) Panel Supplier to deliver the Masterton Hospital demolition. Full scope and project requirements are outlined within Appendix 1 Masterton Hospital Site Clearance Demolition Scope of Works. A brief project background and intended end state is provided below.
Project Background
The LINZ managed former Masterton Hospital is situated next to the Wairarapa District Health Board (WHB) new Masterton Hospital, they share vital services through the underground network of service tunnels.
There are three tenanted buildings in the middle of this site that are leased to Masterton Medical Centre, and will remain open and operational during this project.
The former Masterton Hospital buildings scheduled for demolition have been vacant for approximately 10 years, and the building conditions vary in structural integrity, weather tightness and environmental states. Consideration for minimising noise and vibration disruption to the tenanted buildings and neighbouring hospital are to be factored into the demolition methodology.
The Hospital is a fire risk and it is important to ensure that all buildings remain fire protected as long as practical in accordance with the Building Consent.
The project is divided into three separable portions, these are briefly described as follows:
• Enabling Works
• Above ground demolitions
• Below ground demolitions
For a detailed breakdown of the scope for each of the separable portions, please review Masterton Hospital Site Clearance Demolition Scope of Works (pages 7-9).
Intended end state
The services are to be reconfigured and disconnected to enable the former and new hospital sites to operate independently of each other and must house the new services within their own boundaries.
The vacant built structures are to be removed and the site is to be finished in a clear, tidy and safe condition.
All works must be completed by no later than April 2021.
Scoping information - Provided as Appendix 1 Masterton Hospital Site Clearance Demolition Scope of Works.