Lyell Creek Pump Station Upgrade

Details

Tender Closed
RFx ID : 22875959
Tender Name : Lyell Creek Pump Station Upgrade
Reference # : RFQ-EQ-101 Restricted Tender
Open Date : Thursday, 2 July 2020 3:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 31 July 2020 12:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Quotations (RFQ)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Marlborough
Exemption Reason : 14.9.i Secondary procurement
Required Pre-qualifications : None
Contact : Hunter Stivens
hunter@pdpgroup.co.nz
021317115
Alternate Physical Delivery Address  : STANTEC NEW ZEALAND, HAZELDEAN BUSINESS PARK, 6 HAZELDEAN ROAD, ADDINGTON, CHRISTCHURCH 8011
Alternate Physical Fax Number  :
Agency Address :
Overview

scope of the works at the Lyell Creek Pump Station is generally as follows:
i. Fitting new pipes, fittings, valves and pumps within the wet well and dry well. One of the two pumps within the Contract will be supplied by the Principal.
ii. Structural modifications to the existing wet well and dry well including breaking down part of the existing walls and floor slabs, making good exposed rough concrete and reinforcing, repairing concrete defects on underside of wet well lid
iii. Removal and disposal of existing walkway bridge and extension of the footpath safety railing and supports
iv. Design, supply and install of removable lid sections, removable support beams and access covers for the existing wet well, dry well and new valve chamber and ladder within the existing dry well
v. Confirmation of existing alignments, levels and extents of existing gravity mains and pressure pipework and thrust blocks prior to commencement of installation
vi. Supply and install of new precast manhole valve chamber including pipework, valves, fittings, air valve ventilation pipework and vent stack
vii. Supply and install of new flow meter within precast manhole flow meter chamber,
viii. Supply and install of new cut -in tee and gate valves on the existing AC pressure main
ix. Supply and install of new interconnecting Polyethylene, Steel and ductile iron pipelines and associated fittings
x. Removal and disposal of old pipework, pumps and valves within the dry well, removal and disposal of buried CLS and AC pipes and abandonment in ground of remaining redundant AC pipelines
xi. Supply and install new power supply to the new electrical switchboard and decommission and remove old power supply to old cabinet
xii. Design, supply and install of new electrical switchboard and disposal of old unneeded switchboard and commissioning of the upgraded pump station complete. Qtech has been appointed as the nominated subcontractor for the telemetry and controls scope of the Contract.
xiii. Supply and install of wet well instrumentation including Contractor design of fixing details
xiv. Supply and install of ducting and cabling to electrical and controls equipment
xv. Provision of all temporary works and permanent works necessary for the Contractor to complete the Contract Works including enabling works for over-pumping and protection of functioning assets during the works.
xvi. Supply and install of hardstand area adjacent to and around the existing PS structure and new valve chamber
xvii.

RFx Outcome

No Winner Project awarded a while ago - now completed. Tenderers were advised directly