You are not logged in.

Ava Rail Bridge Shared Use Path Replacement ECI

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 32146779
Tender Name : Ava Rail Bridge Shared Use Path Replacement ECI
Reference # : HCCARBJULY2025CONSTRUCT
Open Date : Monday, 28 July 2025 12:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Friday, 15 August 2025 2:00 PM (Pacific/Auckland UTC+12:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 72000000 - Building and Facility Construction and Maintenance Services
  • 81000000 - Engineering and Research and Technology Based Services
  • 95000000 - Land and Buildings and Structures and Thoroughfares
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : Shania Rajanayagam
shania.rajanayagam@huttcity.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

HCC is seeking to engage a qualified and experienced contractor to deliver Early Contractor Involvement (ECI) services followed by physical construction of the Ava Rail Bridge Shared Use Path Replacement project. The project involves replacing an ageing pedestrian structure with a new, safe, and accessible shared use path clip-on alongside the Ava Rail Bridge — a key link in Lower Hutt’s active transport network.
The successful Respondent will work collaboratively with HCC, the appointed design consultant, and Quantity Surveyor (QS) during the ECI phase to provide input on construction methodology, staging, buildability, risk management, and cost validation. Following the completion of the design and consenting phase, the Respondent will then deliver the full construction works, with a target construction start date of January 2026