Maintenance Resealing 2023-24 to 2025-26 Contract AD16-4441

Details

Tender Closed
RFx ID : 27020028
Tender Name : Maintenance Resealing 2023-24 to 2025-26 Contract AD16-4441
Reference # : AD16-4441
Open Date : Wednesday, 1 March 2023 3:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Friday, 31 March 2023 2:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Tenders (RFT)
Tender Coverage : All of Government  [?]
Categories :
  • 30111600 - Cement and lime
  • 30111800 - Aggregates
  • 30120000 - Roads and landscape
Regions:
  • Wellington
Exemption Reason : None
Required Pre-qualifications : None
Contact : Martin Gribble
Martin.Gribble@Stantec.com
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

Hutt City Council (HCC) is seeking an experienced and competent Contractor to undertake the Maintenance Resealing on road carriageways in Lower Hutt City.

The Contract is a hybrid chipsealing contract that incorporates elements of TNZ P/04 and NZTA P17.

The Contract is for an initial period from 1 July 2023, terminating on 30 June 2026 with the option of two 12-month extensions on completion of the initial period until 30 June 2027 and 30 June 2028 respectively, at the sole discretion of the Principal.

Works to be carried out under this Contract includes, chipsealing, thin asphaltic surfacing at high stress locations, high friction surfacing, roadmarking reinstatement, and any maintenance works notified before the end of the Defects Notification Period. The maximum area of asphalting at each site is not expected to exceed 400 m2.

Services include traffic management, public notification and relations, provision of regular progress reports, chip seal spray rate design, identifying and raising service covers and previously sealed over service covers, reinstating roadmarking and recording as built / RAMM data of the completed work.

The HCC has a quality driven approach to its maintenance and construction projects. In keeping with this philosophy, Contractors are expected to achieve the highest standard of performance on all aspects of this project. In particular, the Contractor shall pay attention to actively managing Temporary Traffic Management.

Professional Services and Project Management for the Contract are being provided by Consultants for HCC.

Further information can be obtained from Martin Gribble, Practice Leader - Pavements and Surfacing, Stantec, Martin.Gribble@Stantec.com