Gore Pipeline Construction Contract (WTP Upgrade)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 23190560
Tender Name : Gore Pipeline Construction Contract (WTP Upgrade)
Reference # :
Open Date : Friday, 28 August 2020 9:00 AM (Pacific/Auckland UTC+12:00)
Close Date  : Wednesday, 14 October 2020 4:00 PM (Pacific/Auckland UTC+13:00)
Tender Type : Request for Proposals (RFP)
Tender Coverage : Sole Agency  [?]
Categories :
  • 83101500 - Water and sewer utilities
Regions:
  • Southland
Exemption Reason : None
Required Pre-qualifications : None
Contact : Hashem Ramezan-zadeh
HRamezan-zadeh@goredc.govt.nz
021 195 7018
Alternate Physical Delivery Address  : N/A
Alternate Physical Fax Number  : N/A
Agency Address :
Overview

Tenders are invited from suitably qualified contractors to submit proposals for undertaking the construction of the raw and treated interconnecting water pipelines as a part of the Gore water treatment plant upgrade programme. The raw water from the Jacobstown wells to be conveyed to the water treatment plant at East Gore. The treated water to be conveyed from the treatment plant to connect to the current raw water pipelines supplying the Hilbre WTP near the Jacobstown wells. Over most of their length, both pipelines will be in the same trench. Both pipelines cross the Mataura River within steel sleeves constructed as part of the Longford pedestrian and cycle bridge.

The contract incorporates two separable portions, one for the bulk of construction works and a second for the tie-in works to be coordinated with overall scheme commissioning.

The Contract Works include the following:
1. A rising main linking the existing Jacobstown bores to the upgraded Wentworth St Water
Treatment Plant (WTP). This pipeline includes the renewal of a 1970’s era DN300 AC
raw water rising main from Woolwich St to the WTP, subject to budget confirmation. In
total, this pipeline is about 3.1 km long;
2. A treated water main linking east and west Gore treated water reservoirs. This pipeline is
also about 3.0 km long.
3. An aerial crossing of the Mataura River via installation of both pipes within steel pipe
sleeves suspended from the underside of the bridge (steel sleeves and all bridge
construction by others).
4. Co-ordination with other contractors working on separate elements of the WTP Upgrade
project and on the Longford Bridge pedestrian walkway and cycleway project.
5. Completion of Separable Portion B works and providing pipelines commissioning support
as part of a commissioning programme co-ordinated by others.
6. Pipeline detailed design and Construction Drawings in Appendix CC.1 are based on
welded PN12.5 PE100 HDPE pipe. Alternatives using PN12 PVC-U would be considered,
subject to additional detailing of thrust restraint by the Contractor. Refer to the Request
for Proposal document for more details.


Specific exclusions from the scope of the Contract Works are:
1. Upgrading work to the water treatment plant in Wentworth St – this work will be
completed under a separate Contract, but both contractors will be required to co-ordinate
works between the two contracts;
2. Construction of a bridge and associated steel sleeve pipes across the Mataura River;

RFx Outcome

This tender has been awarded.

  • Fulton Hogan - 267, Tramway Road, Invercargill, 9810, NEW ZEALAND

Further Award Information:
A conditional contract awarded to Fulton Hogan on 29 March 2021. The commencement of the contract works is subject to obtaining resource consent for the river crossing bridge (Longford).

Award Date: Tuesday, 30 March 2021 (Pacific/Auckland UTC+13:00)
Date RFx was completed/updated: Friday, 12 February 2021 5:30 AM (Pacific/Auckland UTC+13:00)