|
Tender Closed
|
|
| RFx ID : | 23628436 |
| Tender Name : | Engineering Consultant Services for Preparing the Detailed Business Case for Core Infrastructure Upgrade at Middlemore Hospital |
| Reference # : |
CT1912-001
|
| Open Date : | Monday, 16 November 2020 4:30 PM (Pacific/Auckland UTC+13:00) |
| Close Date : | Tuesday, 1 December 2020 3:00 PM (Pacific/Auckland UTC+13:00) |
| Department/Business Unit : | Facilities Management |
| Tender Type : | Request for Proposals (RFP) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
Jonathan Graham Jonathan.graham@middlemore.co.nz 021 611 611 |
| Alternate Physical Delivery Address : | |
| Alternate Physical Fax Number : | |
| Agency Address : | |
Counties Manukau District Health Board (CMDHB) seeks to engage Engineering Consultant Services’ Technical Expertise to help CM Health prepare a single-stage business case for upgrading the services infrastructure at Middlemore Hospital. The Business Case (BC) will seek funding approval valued at circa $20,000,000 from the Minister of Health for this project. This project is Stage 1 or an upgrade programme for services infrastructure that will address outstanding seismic resilience and asset condition issues and provide for the future development of the Hospital.
The services infrastructure at Middlemore Hospital has developed as the Hospital grew. The DHB added new buildings as the demand for clinical services increased over time. The hospital master development plan currently incorporates this legacy.
CM Health has accepted independent seismic assessment reports that confirm the Galbraith Building is Earthquake Prone. Hospital authorities constructed the Galbraith Building in two stages in 1960 and 1962. Since its opening in 1964, New Building Standards (NBS) have evolved to require higher levels of seismic resilience. The results of the Detailed Seismic Assessment in 2018 indicate the Galbraith Building’s seismic rating is 20%NBS given its role as an importance-level-four building(IL4). According to the Building (Earthquake-prone Buildings) Amendment Act 2016, CM Health has a maximum of 35 years to remediate any buildings formally identified by Auckland Council as earthquake-prone.
The Galbraith Building contains infrastructure that services other parts of the Hospital. Some services infrastructure is also obsolete and in unreliable condition. The Hospital must establish an improved services infrastructure layout that allows the retirement of some of it’s older buildings and accommodates future growth. The proposed project will initiate a staged upgrade and restructuring of the services infrastructure at Middlemore hospital. The business case will outline a services infrastructure master plan (SIMP) that identifies and prioritises equipment that needs relocation, repair or replacement, addresses the need to retire older buildings and describes a services infrastructure network that accommodates the Hospital’s future development. Stage One of the SIMP will provide for the relocation and isolation of infrastructure services to accommodate retiring the Galbraith Building in the future.
This tender has been awarded.