Stormwater (SW) Ōtākaro Avon River Corridor Stopbank Anzac Drive to Waitaki Street (OARC)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 33375614
Tender Name : Stormwater (SW) Ōtākaro Avon River Corridor Stopbank Anzac Drive to Waitaki Street (OARC)
Reference # :
Open Date : Monday, 5 October 2026 2:00 PM (Pacific/Auckland UTC+13:00)
Close Date  : Thursday, 26 November 2026 12:00 PM (Pacific/Auckland UTC+13:00)
Department/Business Unit : Infrastructure
Tender Type : Request for Tenders (RFT)
Tender Coverage : Sole Agency  [?]
Categories :
  • 30120000 - Roads and landscape
  • 72103300 - Infrastructure maintenance and repair services
  • 72120000 - Nonresidential building construction services
  • 72140000 - Heavy construction services
Regions:
  • Canterbury
Exemption Reason : None
Required Pre-qualifications : None
Contact : Miranda Adams
Miranda.Adams@ccc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Overview

The Works for this RFT shall include, but are not limited to:

SP1 – Anzac to Waitaki Flood Protection:

• Sheet‑pile floodwall and embankments – installation of STU2700 sheet piles, core material tie‑ins, toe drains, earth embankments on both sides, and safety barrier along Anzac Drive.
• Stormwater and groundwater infrastructure – new gravity reticulation, swales, debris screen structure, stormwater pump station (3 × 0.5 m³/s pumps), northern groundwater pump station, rising mains, distribution chamber, and river outfall works.
• Roading upgrades – full reconstruction and raising of Wainoni Road to RL 2.92 m, new shared paths/cycle lanes, sump adjustments, and service relocations.
• City to Sea Pathway and access works – 4 m‑wide asphalt pathway on embankment, access tracks, small culvert installations, and tie‑ins to existing routes including Falconwood Grove.
• Landscaping and siteworks – ecological planting, reserve works (incl. Jack Hinton Memorial relocation), architectural electrical building, fencing, contaminated soil handling, earthworks, and site reinstatement.

SP2 – Waitaki Treatment Facility:
• Construction of a stormwater first flush basin that will provide storage and treatment of first flush volume runoff from the adjacent urban catchments.
• Construction of twin stormwater treatment wetlands which, in addition to treating stormwater, will provide ecological benefit by providing habitat for birds and other wildlife.
• Construction of the final length of the upstream piped connection with associated manholes.
• Abandonment of remaining stormwater and wastewater pipes that are in Bexley Road and removal of almost all services that are below the formation level of the stormwater management facility.