You are not logged in.

St Davids Street Pipeline Renewal (Lyttleton)

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

Tender Closed
RFx ID : 26846026
Tender Name : St Davids Street Pipeline Renewal (Lyttleton)
Reference # : Restricted Tender
Open Date : Friday, 11 August 2023 12:00 PM (Pacific/Auckland UTC+12:00)
Close Date  : Thursday, 7 September 2023 12:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Infrastructure
Tender Type : Request for Quotations (RFQ)
Tender Coverage : Sole Agency  [?]
Categories :
Regions:
  • Canterbury
Exemption Reason : None
Required Pre-qualifications : None
Contact : Miranda Adams
Miranda.Adams@ccc.govt.nz
Alternate Physical Delivery Address  :
Alternate Physical Fax Number  :
Agency Address :
Overview

The Contract Works can generally be summarised as the following:
Installation of approximately 60m of DN300 & DN225 PVC-U stormwater piping and related structures to renew the existing above ground piping that runs along and over the heritage concrete stormwater channel running alongside the boundary of 14 St David Street between St David Street and The Terrace in Lyttleton.
The work involves the removal of the existing DN200 above ground concrete piping and reinstatement of a new stormwater above ground piping on plinth structures to protect the integrity of the heritage channel.
Specific Archaeological Authority conditions apply to these works:
• The installation of a new stormwater pipeline on top of a heritage concrete channel
• The deconstruction and reinstatement of a red scoria retaining wall.
An archaeologist is required to monitor and record the on-site archaeological work. CCC have contracted Underground Overground to conduct these activities.

RFx Outcome

No Winner This contract has been awarded to Westroads Limited T/A Trenching Dynamix and will start on a date to be advised by the Engineer's Rep. The duration of the contract is 60 Working Days