You are not logged in.

Duvauchelle Water Supply Treatment Plant

This tender is using the new split file responses feature on GETS. The agency has indicated that they would like to receive responses separated by price and non price components. Please keep this in mind when preparing your response for submission via GETS.

Details

RFx ID : 24350869
Tender Name : Duvauchelle Water Supply Treatment Plant
Reference # : 24663280
Open Date : Monday, 22 June 2026 4:30 PM (Pacific/Auckland UTC+12:00)
Close Date  : Tuesday, 4 August 2026 12:00 PM (Pacific/Auckland UTC+12:00)
Department/Business Unit : Infrastructure
Tender Type : Request for Quotations (RFQ)
Tender Coverage : Sole Agency  [?]
Categories :
  • 47100000 - Water and wastewater treatment supply and disposal
Regions:
  • Canterbury
Exemption Reason : None
Required Pre-qualifications : None
Contact : Steffie Pereira
steffie.pereira@ccc.govt.nz
Alternate Physical Delivery Address  : N/A
Alternate Physical Fax Number  :
Overview

The purpose of this RFT is to invite Tenderers to submit their Tenders for the upgrade of the Kaitouna Duvauchelle Water Supply Treatment Plant. The existing Duvauchelle Water Treatment Plant (WTP) utilises conventional media and cartridge filtration technology and does not consistently comply with the Drinking Water Standards for New Zealand. During high turbidity events, water must be brought by tanker from elsewhere to meet demand, at a significant cost. The purpose of the project is to upgrade the existing water supply treatment plant, to ensure that Council provides a facility that:

• Produces drinking water in accordance with the following New Zealand Drinking Water Regulatory Framework.
• Utilises membrane filtration to provide a minimum 4 log protozoa credit.
• Has low total lifecycle costs, including by minimising energy use and chemical use.
• Provides fully automated plant operation, with a high level of reliability, to minimise operational interventions and maintenance requirements and associated costs.
• Has conforming electrical, instrument and controls system design and operation including SCADA interface and telemetry system.

The new treatment plant will be constructed on the site of the existing treatment plant. The site is an operational water treatment plant, which must be maintained in continuous service during the Contract.